Spursalot
Jimmy McCormick
All we need is a removable South Stand to let air and sun in.
Sod it, let's build a horseshoe stadium with Spurs on the side
Horseshoes are meant to be lucky right?
All we need is a removable South Stand to let air and sun in.
Sod it, let's build a horseshoe stadium with Spurs on the side
See my last post - the curved design concept is out dated and moveable pitches completely unnecessary. The light rigs shown in people's photos are better than sunlight. Pitches are tested to micro biological level for parasites or bacteria that might destabilise the turf.
Its a science!
Read your last post and greatwhitenorf's post.
I understand what you're both saying. And you make a good case for it, I just don't understand why, if it's that straightforward to solve, why are major clubs like Inter and Milan playing on sub-par pitches again and again and living with the added cost of re-laying the pitch over and over.
Read your last post and greatwhitenorf's post.
I understand what you're both saying. And you make a good case for it, I just don't understand why, if it's that straightforward to solve, why are major clubs like Inter and Milan playing on sub-par pitches again and again and living with the added cost of re-laying the pitch over and over.
Read your last post and greatwhitenorf's post.
I understand what you're both saying. And you make a good case for it, I just don't understand why, if it's that straightforward to solve, why are major clubs like Inter and Milan playing on sub-par pitches again and again and living with the added cost of re-laying the pitch over and over.
Read your last post and greatwhitenorf's post.
I understand what you're both saying. And you make a good case for it, I just don't understand why, if it's that straightforward to solve, why are major clubs like Inter and Milan playing on sub-par pitches again and again and living with the added cost of re-laying the pitch over and over.
In short:
Nature >>>>>> Technology
No idea what they do at those clubs, but in the first post I also mentioned the use of Desso pitches in combination with the lighting rigs.
Spurs have used it for a long time, Arsenal, Chelsea, Liverpool, Emirates Marketing Project, Man Utd, Wembley solved their problems of a couple years ago with it, Real Madrid (their head groundsman was previously at Arsenal).
Its noteable that none of the top European teams who are known for having issues with their pitches use the system.
It is also worth remembering that the main practise pitch at the new training ground will be exactly the same composition as the new stadium pitch...... good plan:idea:
I'm thinking the San Siro pitch gets relaid because two top teams groundshare and it doesn't get the rest and recuperation it needs because their relative success means plenty of additional games in CL or domestic cup comps. The cold, clammy winter climate - and the odd major concert, i.e. U2, doesn't help either.
Had a quick look at their website: http://www.dessosports.com/en/sports/football/football-projects/
While it seems obvious that they have a good product and I'm very happy with our pitch just about year round. I remember them talking about this (or something similar) when I was on the stadium tour 10 years ago. But I can't say that this means that stadium design is inconsequential and that they can make great football pitches without architectural regards.
so... any ideas about the build schedule? will we retain that 3 year plan where we tear down one end, turn the pitch and continue playing?
I think we first had a desso pitch installed around 2002, but obviously in 10 years the system will have gone through many versions. The current desso system will be unrecognisable from the technology first used.
Stadium design is clearly not completely inconsequential, but it has a far lesser impact than a lot of people think due to advancements in technology and knowledge on how to use it.
Look at the mess the wembley stadium pitch was in when we played Portsmouth in the FA Cup semi. This is a stadium which supposedly had many of the features people use as examples for sunlight, airflow etc. Wembley installed a desso pitch that summer, and you'll never have heard a complaint since. This despite the fact they had concerts, rugby league and union games.